Audi AG, Neckarsulm, Germany

New building and extension of test facility building C14

Project facts

Year

Year 2004-2007, 2008-2012

Duration

7 years

Competences

Turnkey engineering

New test facility building C14

  • 3.200m² floor area; 78 m × 42 m × 28 m (L × W × H)
  • 20 test benches (development, functional and endurance test benches for petrol and diesel engines, dynamic test benches, commissioning test benches)
  • Provision for the expansion of a dynamic test bench with height and cold simulation
  • Building services areas, service rooms, transport aisle, workshops, offices, sanitary rooms, social rooms
  • 42 million Euro investment costs

Extension of test bench building C14:

  • 11 development test benches for engines
  • 8 load-free test benches
  • 2 single cylinder test benches
  • 2 drag test benches
  • 1 commissioning test bench
  • Component test benches (pressure chamber-EMI, diesel system, flow bench)
  • Gross floor area approx. 13.000m²
  • Test bench concept with accessible test bench pits
  • Extension and functional connection 1st construction phase, 2nd construction phase and existing building

Ready to turn your idea into reality with SBI WBI?

Together, we turn your idea into a true success project.

Ready for the next step? Inquire now!

Similar References

Get a personal insight into the work of SBI WBI.

Formula 1 wind tunnel – 1
Toyota Motorsport GmbH, Cologne, Germany
Climatic wind tunnel with a maximum speed of 250 km/h
Geely Automobile, Hangzhou Bay, China
Aerodynamics wind tunnel for motorsport development
England